1. |
06-Apr-2024 06:00 PM |
20-Apr-2024 11:00 AM |
20-Apr-2024 02:00 PM |
[Annual Maintenance Contract (AMC) for Electronic weigh bridge I and II installed at Invoice cell at CPCL Manali]
[CPCLN24146][2024_DGMMC_9427_1]
|
CPCL,DGM(M and C)||CM - CONTRACTS||Sr.MANAGER||Sr Engr Officer
|
2. |
06-Apr-2024 04:20 PM |
20-Apr-2024 11:00 AM |
20-Apr-2024 02:00 PM |
[Construction of Compound Wall at CPCL Land adjacent to CPCL Polytechnic Building]
[CPCLG24138][2024_DGMMC_9425_1]
|
CPCL,DGM(M and C)||CM - CONTRACTS||Sr.MANAGER||Sr Engr Officer
|
3. |
18-Mar-2024 04:35 PM |
20-Apr-2024 11:00 AM |
20-Apr-2024 02:00 PM |
[Overhauling of main air blower 4MW, 6.6KV, four pole, LDW make motor during Ref 2 M and I at CPCL, Manali Refinery]
[CPCLN24106][2024_DGMMC_9408_1]
|
CPCL,DGM(M and C)||CM - CONTRACTS||Sr.MANAGER||Sr Engr Officer
|
4. |
06-Apr-2024 04:15 PM |
20-Apr-2024 11:00 AM |
20-Apr-2024 02:00 PM |
[Development, fabrication and supply of Exchanger Test / Gland Rings and Machining jobs for Refinery-II M and I Shutdown-2024 in Manali Refinery of CPCL]
[CPCLG24147][2024_DGMMC_9424_1]
|
CPCL,DGM(M and C)||CM - CONTRACTS||Sr.MANAGER||Sr Engr Officer
|
5. |
06-Apr-2024 06:30 PM |
20-Apr-2024 11:00 AM |
20-Apr-2024 02:00 PM |
[Annual rate contract (ARC) for civil repair works Zone III and Zone VII at CPCL Manali Refinery]
[CPCLN24118][2024_DGMMC_9428_1]
|
CPCL,DGM(M and C)||CM - CONTRACTS||Sr.MANAGER||Sr Engr Officer
|
6. |
06-Apr-2024 06:55 PM |
20-Apr-2024 11:00 AM |
20-Apr-2024 02:00 PM |
[Installation and Commissioning of Anti surge controller in 210-K-1C]
[CPCLN24152][2024_DGMMC_9429_1]
|
CPCL,DGM(M and C)||CM - CONTRACTS||Sr.MANAGER||Sr Engr Officer
|
7. |
28-Mar-2024 04:00 PM |
20-Apr-2024 11:00 AM |
20-Apr-2024 02:00 PM |
[Basic Feasibility Study for revamping Electrical System to cater to future load requirements in Manali Refinery of CPCL]
[CPCLG24134][2024_DGMMC_9416_1]
|
CPCL,DGM(M and C)||CM - CONTRACTS||Sr.MANAGER||Sr Engr Officer
|